佳能C2020出E000020-0060
更新時間:2025/7/23 8:42:36,view:157蘇州佳能2020打印機售后服務中心客服熱線69616769,蘇州佳能打印機售后維修電話,佳能打印機售后網(wǎng)點,佳能2020需要載體嗎,CANON報錯E000002,錯誤代碼e002,c提示未安裝定影組件,c恢復出廠設(shè)置,c強制加粉,廢粉清理,ir錯誤代碼E355,打印機維修密碼,c彩頁打印復印一體機說明書,c復印重影,復印機復印掃描燈不亮,cE000040-0,c維修代碼e000021-0020,4452開機提示e002,2020維修視頻2025/7/23
佳能C2020出E000020-0060
佳能c2020售后技術(shù)論壇 沈敲萄 2018/9/4 20:38:14 Code E000020-0060
Description ATR patch failed to be created correctly or Patch Sensor error
High density for the target at patch detection
Remedy
1. Check the patch shape.
2. Clean the high voltage contact point with dry wiping or air blower.
3. Check the harness/connector between the DC Controller (UN09) and the High Voltage PCB. Between the DC Controller PCB (UN09/ J21) and the Primary Charging High Voltage PCB (UN06/ J441, J442) Between the DC Controller PCB (UN09/ J21, J22) and the Developing High Voltage PCB (UN07/ J451, J452) Between the DC Controller PCB (UN09/ J19) and the Auxiliary High Voltage PCB (UN08/J461, J462) Between the DC Controller PCB (J205) and the Primary Transfer High Voltage PCB (UN04/J1001)
4. Replace the Drum Unit (Y)
5. Replace the Registration Patch Sensor Unit
6. Replace the ITB Unit.
7. Check conduction of the fuses (FU5, FU8) in the DC Controller PCB (UN09).
8. Replace the Primary Transfer High Voltage PCB (UN04)
9. Replace the Developing High Voltage PCB (UN07)
10. Replace the Primary Charging High Voltage PCB (UN06)
11. Replace the Auxiliary High Voltage PCB (UN08)
12. Replace the DC Controller PCB (UN09)

Description ATR patch failed to be created correctly or Patch Sensor error
High density for the target at patch detection
Remedy
1. Check the patch shape.
2. Clean the high voltage contact point with dry wiping or air blower.
3. Check the harness/connector between the DC Controller (UN09) and the High Voltage PCB. Between the DC Controller PCB (UN09/ J21) and the Primary Charging High Voltage PCB (UN06/ J441, J442) Between the DC Controller PCB (UN09/ J21, J22) and the Developing High Voltage PCB (UN07/ J451, J452) Between the DC Controller PCB (UN09/ J19) and the Auxiliary High Voltage PCB (UN08/J461, J462) Between the DC Controller PCB (J205) and the Primary Transfer High Voltage PCB (UN04/J1001)
4. Replace the Drum Unit (Y)
5. Replace the Registration Patch Sensor Unit
6. Replace the ITB Unit.
7. Check conduction of the fuses (FU5, FU8) in the DC Controller PCB (UN09).
8. Replace the Primary Transfer High Voltage PCB (UN04)
9. Replace the Developing High Voltage PCB (UN07)
10. Replace the Primary Charging High Voltage PCB (UN06)
11. Replace the Auxiliary High Voltage PCB (UN08)
12. Replace the DC Controller PCB (UN09)
熱門圖文